No image available for this title

Karya Ilmiah Mahasiswa

EFFECTIVENESS ANALYSIS OF UNDERPASS DEVELOPMENT PROJECT SCHEDULING AT DEPOK STATION BY PT KERETA COMMUTER LINE INDONESIA (KCI) USING CRITICAL PATHMETHOD (CPM)



Planning and scheduling a project has an important role for the smooth and successful implementation of the project. Failure in a project can be caused by poor planning and ineffective scheduling so that it can cause delays and decreases in quality so that project activities become inefficient. In practice, the duration of the project must be able to anticipate changes in conditions that occur. As for the implementation of the project requires optimal project planning by utilizing the CPM (Critical Path Method). That using the CPM (Critical Path Method) Results in a faster duration of project completion. The duration needed to complete the project with the CPM (Critical Path Method) is 245 days. With the CPM (Critical path Method), project completion time can be accelerated 35 days of the project schedule 280 days and total crash cost Rp. 6,459.660.720.

Keywords : planning, scheduling, CPM


Ketersediaan

1118210250/FEB683/FEBPerpustakaan Fakultas Ekonomi & Bisnis (PRODUKSI)B A C A
D I T E M P A T

Informasi Detil

Judul Seri
-
No. Panggil
683/FEB
Penerbit Fakultas Ekonomi & Bisnis Universitas Pancasila (FEB-UP): Jakarta.,
Deskripsi Fisik
-
Bahasa
English
ISBN/ISSN/NPM
1118210250/FEB
Klasifikasi
NONE
Tipe Isi
text
Tipe Media
Textbook
Tipe Pembawa
-
Edisi
-
Subyek
Info Detil Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain



Pencarian Spesifik


Judul:
Pengarang:
Penerbit:
Koleksi:
Lokasi:

Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaXML DetailCite this